LocalNDTV

Mayur Vihar To AIIMS In 20 Minutes: Delhi's Barapullah Corridor To Open Soon

in5points
  1. The 3.5-km-long Barapullah Phase-3 elevated corridor is expected to open this month.

  2. The corridor connects Mayur Vihar to AIIMS, reducing travel time to 20 minutes.

  3. The project faced a delay of nearly nine years.

NDTV

Center-right

Mixed factuality

Who owns this?

Gautam Adani

Adani Group

Gautam Adani

Acquired by Adani Group in 2022 from the founders.

Wikipedia: Gautam Adani